Home › Services › Foundation excavation

Foundation Excavation in Auckland

Footing trenches, pile holes and slab platforms dug to the engineer's drawings and left clean for the council inspection.

  • Footings and slab platforms dug to set-out
  • Pile holes drilled to design depth
  • Hardfill placed, compacted and tested

Get a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Foundation excavation is detailed earthworks. The surveyor sets out the building, and the footings, thickenings and pile holes are dug to the lines and depths on the engineer's drawings. Tolerances are tight, because every extra 50 mm of depth is concrete you pay for.

The contractor does the digging and the base preparation. The concrete foundations themselves are formed and poured by the builder or a foundation crew, and the two need to be booked back to back so trenches are not left open in the rain.

Clean trench dug in clay
Illustrative photo

Foundation types and the digging each needs

  • Slab on grade. The platform is trimmed level, edge thickenings are trenched, and compacted hardfill and a sand blinding go down under the membrane.
  • Raft or pod slabs. Very little trenching, but the platform has to be flat and firm to the millimetre.
  • Strip footings. Continuous trenches to good ground, often 450 to 600 mm deep on Auckland clay and deeper where the clay is reactive.
  • Timber or concrete piles. Holes drilled with an auger to the design depth. See auger hole drilling.
  • Deep or engineered foundations. Bored piles on soft, sloping or filled ground, set by the geotechnical report.

Good ground, and what happens without it

Footings have to bear on what the building code calls good ground, or on a design by an engineer. In Auckland that rules out topsoil, uncontrolled fill, peat and soft wet clay. If the bottom of a trench is soft, it is dug deeper until it is firm, and the extra depth is filled with concrete or compacted hardfill as the engineer directs. Expansive clay, which shrinks and swells with the seasons, is common across the region and is one reason footings here are deeper than in many other places.

A well-prepared platform avoids most surprises at this stage.

Inspections

The council or the engineer inspects the excavated footings before any concrete is poured. Trenches need to be clean, square, free of water and loose soil, and at the right depth. If rain is coming, the pour is brought forward or the trenches are covered. Older houses with sinking or rotten foundations are a separate job: see foundation repair costs and house relevelling.

Foundation excavation prices

ItemGuide price
Footing trench, dug and trimmed$40 to $90 per metre
Digger with auger and operator$160 to $240 per hour
Imported hardfill, placed and compacted$90 to $160 per m³
Compaction testing$400 to $1,200 per visit
Building platform, near-level section$8,000 to $30,000

Guide prices before GST on a site with reasonable access. The written quote that follows a site visit is the price that counts.

Questions about foundation excavation

How much does foundation excavation cost?

As a guide, $40 to $90 per metre of footing trench, and $160 to $240 an hour for a digger with an auger drilling pile holes. Hardfill under a slab is $90 to $160 per cubic metre placed and compacted.

How deep do footings need to be in Auckland?

It depends on the soil and the design. On firm clay, standard footings are commonly 450 to 600 mm deep. Reactive clay, fill and slopes need deeper or specifically engineered foundations. The engineer or designer sets the depth.

What if the trench fills with water?

It is pumped out and any softened soil at the bottom is removed before the inspection. Concrete should not be poured onto slurry.

What about pipes and cables in the ground?

A beforeUdig request is lodged for the plans of power, gas, water and fibre before any digging. The marked services are then located on site and exposed carefully, because plans are often out by a metre or more.

Who actually does the work?

An independent Auckland earthworks contractor that we partner with. They come to the site, price the job in writing and carry it out under their own name.

How it works

From enquiry to finished job.

  1. Tell us about the job

    Send the form or call. What needs digging, a rough size and a suburb is enough to start.

  2. Site visit

    The contractor checks access, slope, the ground, underground services and where the spoil can go.

  3. Written, itemised quote

    Machine time, cartage, tip fees, imported metal and any consent costs listed separately, with a start date. No obligation.

  4. Dig, cart and tidy up

    Sediment controls go in first. The site is left trimmed, compacted and clean, and you walk it before the last invoice.

Get a price on foundation excavation

Send the form and we will line up a free site visit. You then get a written quote with every cost listed. Or ring and talk it through.

Call 09 886 7219

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote