Home › Guides › Erosion and Sediment Control in Auckland (GD05 Explained)

Erosion and Sediment Control in Auckland (GD05 Explained)

What erosion and sediment control means on an Auckland building site: silt fences, stabilised entrances, GD05, who is responsible and what small sites must do.

In short

  • Every earthworks site in Auckland must keep soil and dirty water on site, consent or not.
  • GD05 is Auckland Council's guideline for how to do it.
  • On a house site the basics are a stabilised entrance, silt fences, covered stockpiles and clean water diversion.
  • Allow $800 to $3,000 for controls on a typical house site.

Erosion and sediment control is the set of measures that stops soil washing off a site while the ground is bare. In Auckland it is required on every site where land is disturbed, whether or not a resource consent is needed. The council's guideline for it is GD05, the Erosion and Sediment Control Guide for Land Disturbing Activities in the Auckland Region.

Why it matters here

Auckland clay is made of very fine particles. Once the grass is stripped, a heavy shower turns the surface to brown water that runs to the nearest stormwater drain. Those drains are not treated. They empty into streams and then the Waitematā, Manukau and Kaipara harbours and the Hauraki Gulf, where the silt smothers the seabed. One uncontrolled house site can lose tonnes of soil in a winter. That is why the council inspects building sites, and why owners and contractors can both be fined.

Erosion control and sediment control are different things

  • Erosion control stops soil from moving in the first place: keeping grass on as much of the site as possible, diverting clean water around the work, covering bare ground and stockpiles.
  • Sediment control catches soil that is already moving: silt fences, sediment traps and ponds.

Erosion control is cheaper and works better. GD05 puts it first.

The controls on a typical house site

ControlWhat it does
Stabilised entranceA pad of coarse aggregate at the gate so trucks do not carry mud onto the road
Silt fenceFabric fence along the low side that ponds runoff and lets silt settle
Super silt fenceA reinforced version backed with mesh for steeper or larger catchments
Clean water diversionA bund or channel on the high side that sends uphill water around the site
Stockpile coverPolythene, geotextile or mulch over soil heaps, placed away from drains
Stormwater inlet protectionFilters around nearby catchpits as a last line of defence
StabilisationMetal, mulch, grass seed or geotextile on finished ground

Silt fences done properly

A silt fence only works if water cannot get under or around it. The fabric is dug into a trench about 200 mm deep and backfilled, posts are close enough that the fence does not sag when water ponds behind it, and the ends are turned uphill so runoff cannot escape around them. It runs along the contour, not down the slope. It needs checking after every rainfall, and the silt behind it is dug out before it reaches about a third of the fence height. A fence laid on top of the ground and held down with a few bricks does nothing.

The entrance

Mud on the road is the complaint the council hears most. A stabilised entrance is a layer of large, clean aggregate over geotextile, wide enough for a truck and long enough for its wheels to shed mud. If soil still reaches the road, it is swept or shovelled up the same day. Hosing it into the gutter sends it straight to the stormwater drain and is an offence in itself.

Larger and steeper sites

As the exposed area grows, silt fences are not enough. GD05 sets out when a site needs a decanting earth bund or a sediment retention pond, which hold runoff long enough for silt to settle, sometimes with a flocculant added to help fine clay drop out. Steep sites need contour drains, benches and progressive stabilisation so that only part of the slope is bare at any time. These controls are designed by an engineer or erosion and sediment specialist and shown on the erosion and sediment control plan lodged with a consent.

The order of work

  1. Install the entrance, clean water diversions and perimeter silt fences before any topsoil is stripped.
  2. Strip only the area needed for the current stage.
  3. Stockpile topsoil away from drains and flow paths, and cover it.
  4. Check and repair controls before forecast rain and after it.
  5. Stabilise each area as soon as it is finished: metal on driveways and around the building, mulch or grass elsewhere.
  6. Remove controls only when the site is stable.

Other things that count as discharges

  • Concrete washings. Highly alkaline and toxic to stream life. Trucks, pumps and tools are washed out in a contained area, never into a drain.
  • Water pumped from excavations. It has to be settled or filtered before it leaves the site.
  • Dust. In dry, windy weather, bare ground is dampened or covered.
  • Cut concrete and paint. Slurry and wash water are kept out of drains.

Who is responsible

Everyone involved carries some responsibility under the Resource Management Act: the owner, the builder and the earthworks contractor. In practice the contractor installs the controls and the builder maintains them for the rest of the build. Make it explicit in the contract who does what, especially who inspects after rain and who cleans the road. Council officers can issue abatement notices and infringement fines on the spot.

What it costs

For a typical house site, the entrance, silt fences, a diversion bund and stockpile covers come to $800 to $3,000, depending on the size and slope of the section. Sediment ponds and treatment on larger sites cost a great deal more and are priced with the bulk earthworks. Against that, cleaning a street, a stormwater line and a neighbour's driveway after a washout, plus the fine, costs several times as much.

Sediment control is part of every quote arranged through this site. See how it fits with site clearing, the site scrape and earthworks consent.

Common questions

Do I need sediment control for a small job like a driveway?

Yes. Any work that exposes soil has to keep it on site. For a driveway that usually means a silt fence along the low side, protection on the nearest stormwater inlet and keeping the road clean.

What is GD05?

Auckland Council's guideline document 2016/005, the Erosion and Sediment Control Guide for Land Disturbing Activities in the Auckland Region. It sets out how each control should be designed, built and maintained.

Who gets fined if sediment leaves the site?

The owner, the builder and the contractor can each be held responsible. Agree in writing who installs and who maintains the controls.

How long do silt fences stay up?

Until the ground they protect is stabilised with grass, mulch, metal or paving. Taking them down early is a common cause of washouts at the end of a build.

Want a firm price for your site?

Send the form and we will line up a free site visit. You then get a written quote with every cost listed. Or ring and talk it through.

Call 09 886 7219

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote